21 hours ago21 hr I have a concrete slab on which I am laying 50mm of PIR and then 50mm of screed containing UFH.The finish on the concrete is not totally smooth, can I just lay PIR and trust it will settle or do I need to lay a blinding with sand or similar first? And if so, What's the best technique? Above or below DPM?
21 hours ago21 hr Are you just having 50mm insulation or was that typo?What's under the concrete slab
20 hours ago20 hr 54 minutes ago, Ed_ said:The finish on the concrete is not totally smoothOne man's not smooth is another man's mill pond :-)Are you talking a few mm difference, the occasional protruding piece of stone in the concrete, or is it an overall tamped only surface (AKA garage floor rough)? The PIR will give a bit and "soak up" the roughness. Have your considered levelling products instead of a sand blinding as this would be a more stable base for your 50mm PIRA picture will help.
18 hours ago18 hr Author I have thought about levelling but I've got around 90m2. Do you think it would be easy enough to do over that sort of area?
17 hours ago17 hr What we see there is roughness. Pir is not strong so any odd stones will puncture the surface and allow the insulation to mate more closely, especially after you have walked over it several times.Small ups and downs will become voids but they will be insulated pockets in effect.Levellness does not matter, as the insulation will follow the shape, and the screed can follow it or be laid level, as you instruct.What is more important is whether the surface is on a consistent plane that the insulation can follow, or has significant undulations. These could result in large areas being out of contact, bouncin in use and the hardened screed cracking.Test this by straightedge. Officially a 3m one is used, but 2m will do in your case.Lay it down in multiple positions and directions and see what gaps appear.And report back.
17 hours ago17 hr Author Thanks for the advice, I will check. I think it is quite flat based on the way the water pools on it.
7 hours ago7 hr 9 hours ago, Ed_ said:based on the way the water pools on it.That's the perfect test. How deep for you think it got?You could use a low tech abrasive to take lumps off. Crawling around rubbing with a hard brick. That way you also soon get the feel of how wavy it is.After the pir is laid you will be taping the joints and then laying dpm over it, so it will get plenty of pressure to press into small lumps. The local pressure is never that high again ( unless you drop the grand piano).
Just now1 min Author 5 hours ago, saveasteading said:After the pir is laid you will be taping the joints and then laying dpm over itAh, I had been thinking DPM under the insulation, but I guess that doesn't make sense as could be punctured by the roughness?So is this a good buildup? -Finished FloorScreed 50mm (containing UFH pipes)DPMInsulation 50mmWaterproof concrete slab5 hours ago, saveasteading said:That's the perfect test. How deep for you think it got?Puddles that are 5mm, maybe up to 10mm deep in places probably cover areas 5-8m plus in length.