Skip to content
View in the app

A better way to browse. Learn more.

BuildHub.org.uk

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

MVHR ducts through Egger floor deck?

Featured Replies

Hi, I’ve got my MVHR designs but wondering about coming up through the floors deck (above posi joists). I have one section where all of my upstairs ducts will come through as o 7 ducts each with 75mm diameter. I’m wondering whether I should cut a rectangular section and add noggins around the edges of deck or individual circular holes or something else? Thanks

  • junglejim changed the title to MVHR ducts through eggar floor deck?

As my MVHR unit is loft based, I constructed a small floor to ceiling cupboard in my sons room for shoes and the like.  At the back of this is a 300mm*500mm void which I pass a bunch of ducts and an SVP stuffed with sound insulation as best i could.  All through egger ontop of posi's.  Personally I wouldn't cut each hole individually.

 

Edit,  All this is within the heated envelope of the house.

Edited by crispy_wafer

1 section. Its quite common to have a hole like this somewhere. On some sites they cut a hole 1400 by about 200 to pass plasterboard up through then nog and patch after. 

  • 4 weeks later...
On 07/08/2026 at 07:13, junglejim said:

Hi, I’ve got my MVHR designs but wondering about coming up through the floors deck (above posi joists). I have one section where all of my upstairs ducts will come through as o 7 ducts each with 75mm diameter. I’m wondering whether I should cut a rectangular section and add noggins around the edges of deck or individual circular holes or something else? Thanks

That's what we have done. Noggins around the Finn Joists. Currently the 22mm T&G is in place, ready to be cut through when the duct is installed. Ours are 108mm insulated pipes.

  • Nickfromwales changed the title to MVHR ducts through Egger floor deck?

Create an account or sign in to comment

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.