Skip to content
View in the app

A better way to browse. Learn more.

BuildHub.org.uk

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Dry screed thickness and can laid by DIY method

Featured Replies

Hi All

Opinions please.

I need to get UFH in newly build kitchen extension. Area coverage is abpout 20 square metres.

Thinking of ready made dry screed laid to about 75mm thickness.

I've never laid screed previously. Will be getting some help but essentially thinking of going the DIY route.

Off course wnat to get evenly level floor.

Can you share any tips.

Has anyone done DIY dry screed floor? How will it take to complete the job in terms of hours?

Thanks

You start by setting the finished height in a number of areas 

then barrow in 20-30 barrow fulls and tip into these marked areas, walk up and down on it and push it into all the corners, keep walking on it, it needs to be fully compacted, not open a fluffy. 
make a flat pad 400mm square level with your finished height mark

go to another mark 2-3 m away and make another pad

Fill in between these pads and compact

use a straight edge, aluminium is best to scrape the in fill down to the top of your pads, fill in low spots and drag again until no air is under the straight edge. 
complete two strips opposite each other

then fill in the big area between these strips and again drag the straight edge over it filling in voids and compacting as you go. 
after you have completed a 1m wide strip the width of the room you can use a plastic float in a figure of 8 motion to even out the straight edge marks. 
don’t worry about loose product sitting on top, these will sweep of when dry. 
continue back for another metre. 
don’t have too many breaks keep the screed always moist on the last edge you don’t want cold joints. 
 

I hope your fit it will kill you if you have not done it before. 
if it’s ready mixed it will take you half a day. 

Create an account or sign in to comment

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.