Jump to content

Recommended Posts

Posted

After a bit of advice following a knock through... As you'd expect, there was a DPC atop those concrete blocks in my picture, now removed along with the wall. Next step is making good and I was planning to put a latex compound down to smooth/sort out slight level differences. BUT, without the DPC, I worry about the risk of moisture ingress via capillary action. It's a block and beam floor and those concrete blocks are ultimately in ground contact. What's the most practical way to resolve the risk?

PXL_20251210_095908403 (Large).jpg

Posted
Posted
54 minutes ago, JFH777 said:

thanks that's not a bad idea

Just make sure you foam or mastic any gaps either side of the blocks so the SLC doesn’t just disappear down south. 

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...