boxrick Posted November 24, 2025 Posted November 24, 2025 Hello folks. A simple question, my plasterer is booked in. There is still a lot of boarding to do. Simply put should I get a room plastered whilst still fitting boards in other rooms? Or will the dust ruin my finish?
bmj1 Posted November 24, 2025 Posted November 24, 2025 Just put up dust sheets if worried about dust - and crack on. Good to make headway with plastering as it takes time to dry out - which is your bigger challenge than dust control and hoovering.
Oz07 Posted November 25, 2025 Posted November 25, 2025 dust wont be a problem have you seen the dust they create when mixing gear. Is he on price though as might have the ump if not 100% ready to go at. Don't slow them down