Jump to content

Recommended Posts

Posted

Hello,

 

I have a new screeded floor in my house. It is traditional screed (sand and cement) which is also reinforced with fibers. It has been drying for the last two months. Im planning to put down laminate flooring on it, but Im not sure if I should seal it first in order to reduce the dust and to protect its surface?


I read online that people recommend sealing concrete based screeds with diluted SBR or with PVA but Im not sure that is true for traditional screeds.

 

PS

Photo taken when it was still drying out.

IMG20250418140355.jpg

Posted

I've always had S&C screeds put down by my excellent screeder, and I only ever seal them if we're tiling or bonding a floor down.

 

There is little to no dust associated with a S&C screed, usually anything on the surface is from cutting plasterboards etc on site (dust/debris) which you can manage with a good vacuum.

 

If the laminate is a floating floor, I'd not waste the time/money tbh.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...