Jump to content

1966 Trusteel framed Bungalow due for replacement with timber frame build


Recommended Posts

Having recently introduced myself I thought I'd put a few pics showing what is, and what, all being well, will be. Demolition is due to begin in about 5 weeks. I am in the process of deciding which timber frame builder to offer the job to. Then during the lead time for the timber frame I should be able to get the new screed, insulation, sole plate etc etc in readiness for the timber frame. 🤞. The pic with the view is looking East, with the bungalow behind me. 

IMG_20220704_172129.jpg

Screenshot 2025-01-15 165406.png

Screenshot 2025-01-15 170146.png

Screenshot 2025-01-15 170246.png

PXL_20240903_095937301.jpg

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...