jpadie Posted June 10 Share Posted June 10 hello all i've got a 120L unvented cylinder with immersion elements that has 22mm feeds. the instructions for plumbing it in are ambiguous but the preference is to have 22mm pipe work. It does say that 15mm is satisfactory if the mains pressure is ok. what's the best way to do this? is it to go from 15 to 22 where the cold comes in and then plumb the security group and cold feed in 22mm? and idem the hot outlet: go from 22mm to a 22mmT and then to two reductions to 15mm? thanks. Link to comment Share on other sites More sharing options...
JohnMo Posted June 10 Share Posted June 10 You do realise you need to be qualified/competent to plumb in an unvented cylinder? Are you using the cold water feed from the inlet group? If not you need pressure control valve near the stop cock and a check valve at the cylinder hot water outlet to prevent back feed to the cylinder. Link to comment Share on other sites More sharing options...
jpadie Posted June 10 Author Share Posted June 10 This is for a garden room. There are pressure limiting valves in the system before the cold leaves the main house. The immersion is mainly for the shower. The shower cold water feed comes from the balanced cold on the inlet group. The inlet group has an nrv and a 3bar pressure limiting valve as well as an outlet for the expansion vessel. Link to comment Share on other sites More sharing options...
JohnMo Posted June 10 Share Posted June 10 22 - 15 - 15 reducing tee for the hot, 15 - 22 reducer for the cold. You still need to be qualified to certify the installation, many plumbers don't like to certify self installation, unless organised before hand. Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now