Jump to content

Recommended Posts

Posted

Not sure if in the right section, can move if needs be. For airtightness at wall plate what production would you reccomend, we had to shim it up to 15mm.

Posted

Your vapour control layer on the ceiling needs to come down the wall and be taped onto the wall, then whatever method of air sealing you are doing for the walls gets lapped either over or under that, if you are dot and dabbing you dab over the ceiling membrane. 

Just imagine you need to draw a continuous line inside your house with no breaks in it. 

Posted
6 hours ago, Russell griffiths said:

Your vapour control layer on the ceiling needs to come down the wall and be taped onto the wall, then whatever method of air sealing you are doing for the walls gets lapped either over or under that, if you are dot and dabbing you dab over the ceiling membrane. 

Just imagine you need to draw a continuous line inside your house with no breaks in it. 

Perfect, thanks Russell.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...