September 26, 20233 yr My gas boiler will eventually move into the loft space. I want to run all the pipework in readiness for that (gas, water, flow, return), before I re-insulate the loft but leave it all disconnected ready for my gas engineer to connect to when I do move the boiler. I plan to run all 4x pipes under the loft insulation, so on the warm side, is there any problem with running gas pipes within wool roll insulation?
September 26, 20233 yr No, it doesn't care, mine was run through insulation space by the gas engineer.
Create an account or sign in to comment