CalvinHobbes Posted June 10, 2023 Share Posted June 10, 2023 So the other half is away to put the radon barrier on the bidons that were delivered yesterday. After building control checks on Monday afternoon, we will get a lorry load of 9x4's and I have been told to drop them on the slab for the main build to kick off. Thing is, I don't want the radon barrier to tear with the work going on. I was thinking of using old carpet to help protect it. Whatcha think? Link to comment Share on other sites More sharing options...