Capable Noob Posted October 26, 2022 Share Posted October 26, 2022 For an extension using blocks, how low down the wall should I attach the wall starter kit? Should I start a few inches up from the footing so the first tie is at the first course (there will be about 2.5 blocks below ground level), or is it only required from say ground level, or even dpc and up...? And is a tie then needed at every course of blocks? Many thanks as usual. Link to comment Share on other sites More sharing options...
Canski Posted October 26, 2022 Share Posted October 26, 2022 I usually start them one course of blocks up from the concrete. There are usually enough ties with the pack to fit them at 225 mm centres after that. One for each skin and also a cavity wall tie within 225 mm from the wall at 225 mm centres. Link to comment Share on other sites More sharing options...
Capable Noob Posted October 26, 2022 Author Share Posted October 26, 2022 2 hours ago, Canski said: I usually start them one course of blocks up from the concrete. There are usually enough ties with the pack to fit them at 225 mm centres after that. One for each skin and also a cavity wall tie within 225 mm from the wall at 225 mm centres. Thanks Canski. I was thinking along the same sort of lines really, just thought I'd see if there was any reason not to. Cheers Link to comment Share on other sites More sharing options...
PeterW Posted October 26, 2022 Share Posted October 26, 2022 Don’t forget to cut where possibly between the inner and outer leaves so you don’t create a cold bridge. Below ground you can use bluebird ties screwed in to the existing brickwork. Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now