jayc89 Posted May 11, 2022 Share Posted May 11, 2022 Our new floor slab was laid on a DPM, which lapped up the walls. The detail is MOT, DPM, Conc, PIR, Screed. We had another section of the floor which was to be block & beamed (over an old cellar). The detail should be B&B, DPM, PIR, Screed. I've come to lay the new DPM over the block & beam, joining it to the existing slab's DPM to find it's been cut, where I need to join it, at the slab level, so I have nothing to join it to. What's my best option here? A liquid DPM between the two? Link to comment Share on other sites More sharing options...
Simplysimon Posted May 11, 2022 Share Posted May 11, 2022 if there's enough to lap it over then a double sided dpm joining tape others available Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now