April 3, 20224 yr As previously stated we have a loan machine that you simply feed the foundation design into The screen follow screen Well there’s a bit more to it than that I needed to Topo guy to build a model to feed into the machine Using the SE foundation design Worked a treat on the main house But due to a nearby hedge BC vaulted the pour of the workshop-office foundation til I had a separate SE drawing Yesterday My wife who isn’t a fan of relying on Technology went up with her tape to check everything Falling flat on her back in the slippery footings Sorry no pics 😁 Verdict House is perfect I couldn’t stop myself from a told you so moment Then the Workshop Im 1100 to narrow and 1700 to short Somewhere between the two professionals and me a mistake has been made BC did me a real favor I had loads of time to run a tape over the house foundations and didnt Lesson learned Measure twice cut once and listen to your other half 😁
Create an account or sign in to comment