Olf Posted November 23, 2021 Share Posted November 23, 2021 I'm planning the refurb to be futureproof and wanted to run 28mm pipes to the UFH manifold, so any future ASHP would have easier life. For the time being the combi will continue the service though, and it uses 22mm connections. Any issues with changing midway the diameter from 22 to 28mm (on feed, so 28 to 22 on return)? Link to comment Share on other sites More sharing options...
TonyT Posted November 23, 2021 Share Posted November 23, 2021 I would face a similar situation when my gas boiler packs in, currently piped in 22 mm to manifolds and 15mm to ground floor rads and 10mm microbore on first floor to rads. found 2 suitable locations for ASHP, preferred location is in drive approx 3m lower than house so may need secondary pump interested to watch this thread! Link to comment Share on other sites More sharing options...
Olf Posted November 23, 2021 Author Share Posted November 23, 2021 My current rads are 15mm copper from 22mm boiler, and previously I had microbore with combi, which makes me think that it does not matter - the flow speed must change accordingly to cross section (with all the consequences, like resistance/pressure drop) and that's about it. The plumber we parted ways today mentioned whistle effect if I forced him to go 28mm (I checked - it happens due to high flow velocities, quite the opposite large diameter does), hence the question before I make my hands wet. Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now