Jump to content

Recommended Posts

Posted

I've been quoted £180 +vat for a bar bending schedule. I'm all for saving money and wondered if this is something I could produce myself?

Posted

No reason you couldn't do it yourself, as long as you have the drawings.  Our SE produced drawings, calcs, a steel list and bending schedule as a part of the package for our big (~2.5m high x ~ 35 m long) retaining wall.  The total cost was £360 inc VAT.

Posted

Yeah you could set up a jig and mass produce but we felt it was more efficient just getting it cut and bent from supplier.  20161201_134545.thumb.jpg.1c7bc926d82291e9d36adaa90627ab37.jpg

  • Like 1
Posted (edited)

Sorry I misread your post. My engineer (Tanner stuctural design) never even offered me a schedule I just made one of the drawings. Pretty straight forward.

Edited by Alexphd1

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...