October 10, 20215 yr Hi, I am looking at getting an overlay system but getting lots of conflicting advice. Is anyone familiar with an over lay system using a 20mm screed? Thank you
October 10, 20215 yr No personal experience but any system is only as good as what is underneath it, can you give any more details of make up to give us an idea of what you are doing and wanting to achieve.
October 11, 20215 yr Author Hi, Thank you for your reply. It's a suspended timer floor construction with joists at 600 topped with 18mm chipboard. There is 250 of rigid insulation between the joists.
October 27, 20215 yr An overlay system with 20mm screed is good from a responce time and one of the best overlay systems for even floor temperatures as the screed conducts the heat out from the pipe centres well. I have it through the original build part of my house. I would recomend that you check it will be okay on the 600 centres and 18mm chip from a structual point of view, but from a system operation and performance you shoudn't be disapointed.
November 8, 20215 yr Author hi, yes it seems that its on the borderline with regards to structure! im hoping that using a wooden engineered flooring over the top and not tiles will help. what size of pipe did you use? lots of systems with their own crates seem to use 12mm but ive heard 16mm is much better so considering doing that with 22mm screed