BobS Posted September 24, 2021 Share Posted September 24, 2021 We are having our slab poured today, 100mm Topflow Horizontal self-compacting concrete. The supplier has been out to prep the area. Because we dug out the previous slab the plan was to run a new DPM up the walls from beneath the slab and lap over the DPC. However, the concrete supplier has cut the DPM they laid off just above where the slab will be. They apparently intend to lay another DPM over the concrete - beneath the insulation, UFH and top screed. When I questioned it they said this is just how they always do it. It seems a bit strange not to run the DPM up the wall in a continuious piece so I wondered if there are any pros or cons to doing it this way? Link to comment Share on other sites More sharing options...
Mr Punter Posted September 24, 2021 Share Posted September 24, 2021 As long as the new DPM laps the DPC it will be OK but needs to be protected against damage. Is the Topflow Horizontal expensive? I would be interested to hear how the pour goes / any photos. 1 Link to comment Share on other sites More sharing options...
BobS Posted September 26, 2021 Author Share Posted September 26, 2021 Pour went well and done very quickly (once the mixers arrived). It's the first time our builder has used it and he seemed really happy with how it went, certainly a lot less work than wheelbarrowing it in. Not sure of the exact cost as the floor was included in our builder's quote but he said it worked out about the same as standard concrete due to the time saving. 1 Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now