Sally Posted January 28, 2021 Share Posted January 28, 2021 Hi At the moment My workshop (that sits behind a high street shop) has its electricity, running as a spur from the front high street shop, it has the old cloth outer cable, run in steel conduit around the outside of the high street shop building and into my workshop. I have a planning approval for change of use approved, and as such want my own supply or electric, gas and water (the water is also a spur, and I have no gas) as far as the electric is concerned, I want 3 phase, (its not important why, but take it as thats what I want) what are the regs regarding laying the conduit for the three phase supply how deep, what size of conduit pipe, does it need that cover that says electric etc etc a link to a spec would be helpfull OR who do I ask for what the suppliers will want Link to comment Share on other sites More sharing options...
Temp Posted January 28, 2021 Share Posted January 28, 2021 (edited) See page 9.. https://www.ukpowernetworks.co.uk/internet/asset/3b7f1ee6-1fc8-461a-a5d5-a4909a64895B/UKPowerNetworks_Site+Information+Pack_V2Dec2017_FINAL.pdf Local suppliers normally know what's needed. Tell them its for a new supply/connection so needs to be DNO approved not a DIY garden shed project. Edited January 28, 2021 by Temp 1 Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now