Arnold9801 Posted September 23, 2020 Share Posted September 23, 2020 (edited) I'm pouring up the foundations for our new build tomorrow with a c25 mix. I've had to put some reinforcing mesh in certain parts and have lifted them about 50mm above the floor. Is that ok? Edited September 23, 2020 by Arnold9801 Link to comment Share on other sites More sharing options...
Mr Punter Posted September 23, 2020 Share Posted September 23, 2020 Probably. About in the middle of the concrete is good so if the slab is 100-150mm thick it is fine. Why did you put mesh in the foundations? Not normally needed (but it won't hurt). Good luck with the pour. Much concrete? Link to comment Share on other sites More sharing options...
Arnold9801 Posted September 25, 2020 Author Share Posted September 25, 2020 Reason for the mesh was due to me having and old soak away trench going right across the new build. Building ctrl wanted me to dig all the way down to the bottom of these trenches where the foundations cross them. This caused the sides to cave in resulting on large holes 10 feet deep. I had to fill these up to just below the floor level of the trenches. The mesh had to go over the top of this concrete in fill and overlap by a foot the trench floor. Thanks for your reply. Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now