djcdan Posted September 1, 2020 Posted September 1, 2020 We have submitted our architects annotated drawings to our Building Warrant. Building Control have come back requesting that the internal drying area be shown on the house plans in addition to the annotations describing the location of internal drying. However, our architect is currently on holiday and unable to make the change. Instead of waiting for his return and delaying the application, can someone else advise how internal drying space should be shown on house plans (or how it was shown on your drawings previously) and I'll add this to the drawings before submitting the revision to BC. The architect can then adapt his master copy on his return should he wish. If it makes any difference to how it is shown, the architects annotation described internal drying on a pulley system.
the_r_sole Posted September 1, 2020 Posted September 1, 2020 hatched box on the plan the right size (fits handily over a bath) 1
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now