Jay fray Posted June 22, 2020 Posted June 22, 2020 Hi I am in the process of building a detached outbuilding built of brick and block with cavity wall construction The neighbour on one side has a burnt out disused shed still with a car in it and a lot of soil. All three of the elevations are problem free in terms of height of DPC however this side is giving me a problem. the problem is that their ground level is at the same height as my DPC If I move some of this Excess soil I can still see the concrete base for the shed and a concrete base for the shed is 150 mm Below my DPC which is perfect I don’t think that they will allow me to remove this eXcess soil therefore if I pushed it back into theOr garden how far do I need to push back so that building control are satisfied that the DPC will not be bridged
Temp Posted June 22, 2020 Posted June 22, 2020 I think 45 degrees is the steepest "angle of repose" (https://en.m.wikipedia.org/wiki/Angle_of_repose ) recommended for a soil bank. Any steeper and you need some sort of retaining wall. I'd allow space for a french drain and a 45 degree bank between your wall and the boundary. If you want to make it closer perhaps look at a retaining wall using railway sleeper(s).
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now