What do LABC consider complete?

Featured Replies

Does anybody know what is generally accepted as being 'complete' by building control? I'll need to remortgage quickly at that point so will need to be as creative as possible when offering for inspection.

I can only tell you where we where at for LABC sign off 

no landscaping Just hardcore 

Temporary timber ramp for disabled access 

Wrote on the certificate Landscaping and DA incomplete 

Kitchen wasn’t complete 
Utility room had no units in 

Deco 70 % complete 

 

They asked for 

final Sap

Gas sign off 

Electric Sign off

Slate certificate 

 
we had a condition in our planning for a rumble strip 

Highways condition for drive access onto the main road 

Solar panels that we didn’t fit 

He didn’t seem interested in these 

 

 

Others May of had more to complete than us 

 

Gas 

electric

and DA seemed to be the main things 

  • Author
12 minutes ago, nod said:

I can only tell you where we where at for LABC sign off 

no landscaping Just hardcore 

Temporary timber ramp for disabled access 

Wrote on the certificate Landscaping and DA incomplete 

Kitchen wasn’t complete 
Utility room had no units in 

Deco 70 % complete 

 

They asked for 

final Sap

Gas sign off 

Electric Sign off

Slate certificate 

 
we had a condition in our planning for a rumble strip 

Highways condition for drive access onto the main road 

Solar panels that we didn’t fit 

He didn’t seem interested in these 

 

 

Others May of had more to complete than us 

 

Gas 

electric

and DA seemed to be the main things 

Thanks Nod, very helpful 

15 minutes ago, Coops said:

Thanks Nod, very helpful 

Your welcome 

23 hours ago, Coops said:

Does anybody know what is generally accepted as being 'complete' by building control? I'll need to remortgage quickly at that point so will need to be as creative as possible when offering for inspection.

 

Things they checked on my final inspection 12 years ago..

 

Every pane of safety glass has BS or CE markings on it.

Every external window pane was coated.

Electrics signed off

Sewers pressure tested.

Checked one door was fire rated (long story)

 

We didn't have a kitchen fitted.

We only had one bathroom finished.

We didn't have a wood burner fitted (waiting for a funnel to arrive)

They didn't check our planning conditions (still in breech of one to this day)

 

We had forgotten some window restrictors but he agreed sign off if we promised to fit them.

 

Our oil tank is also too close to our house/boundary but he also let it go.

 

 

 

 

 

  • Author

I suppose completion has more to do with safety than anything else, structure electrics gas, heating/ventilation that type of thing. Makes sense.

Create an account or sign in to comment

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.