eandg Posted December 2, 2019 Share Posted December 2, 2019 We are going the SIPS route with the supplier doing their own engineering for the kit. The groundworkers' SE can do everything we need for setting out. What else do we need? If nothing else, neither can do the SER (we're in Scotland) so does anyone know the likelihood of finding someone else to do the sign-of if other engineers have done the work? Link to comment Share on other sites More sharing options...
nod Posted December 2, 2019 Share Posted December 2, 2019 Your perhaps better engaging your own SE While the ground workers may or may not use an Engineer for setting He or she will not be a SE and won’t be qualified to do foundation and general load calcs Link to comment Share on other sites More sharing options...
eandg Posted December 3, 2019 Author Share Posted December 3, 2019 On 02/12/2019 at 22:44, nod said: Your perhaps better engaging your own SE While the ground workers may or may not use an Engineer for setting He or she will not be a SE and won’t be qualified to do foundation and general load calcs Thanks. Definitely a qualified SE but one who specialises in 'setting out'. And at £125/visit (with '3 to 4 tops' required I'm told) which is a lot cheaper than commissioning an SE for the full lot even when they're not doing the structure - but only if there's not a lot else I need them for and someone else will do the SER for a turn. Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now