MVHR duct lagging ideas


Recommended Posts

Hello all 

 

Has anybody any suggestions for pipe lagging to suit 125mm and 100mm rigid spiral ducting. 

We have 20m or so running through what can best be described as a loft space that is a good bit cooler than the rest of the building. I’m aware that we may be losing some heat from these pipes both before and after it has been through the heat exchanger so want to do something to minimise it. 

 

Any suggestions gratefully received. 

 

Link to comment
Share on other sites

Welcome. 
 

There are two standard products for this - either fibreglass / Rockwool foil backed insulation or nitrile rubber insulation. 
 

Both are fairly easy to install if you have patience - the main difference is the nitrile products are better bonded to the ducting with impact adhesive where the foil / fibre products are better fitted with tape joins and not stuck to the ducts. 
 

You will probably be looking at £6-8/m installed if you do it yourself. 

 

Link to comment
Share on other sites

3 hours ago, PeterW said:

Welcome. 
 

There are two standard products for this - either fibreglass / Rockwool foil backed insulation or nitrile rubber insulation. 
 

Both are fairly easy to install if you have patience - the main difference is the nitrile products are better bonded to the ducting with impact adhesive where the foil / fibre products are better fitted with tape joins and not stuck to the ducts. 
 

You will probably be looking at £6-8/m installed if you do it yourself. 

 

 

Thanks. 

Have you any product names or suppliers for me to look up please? 

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...