bissoejosh Posted November 5, 2019 Share Posted November 5, 2019 (edited) Currently have a 300 litre UVC ready for a heat pump to handle hot water + heating at a later stage but in the meantime like several others on the forum I would like to add a Willis heater between the manifold flow/return to run our UFH system. System is 3 x 100m loops all to be run as one zone in a 100mm screed. Wunda manifold is installed minus a pump at this stage. Wiring wise 3 core + earth from the stat is in place and power can be added from the plant room board easily. I would like to finalise and order the necessary components so if someone could advise if I've missed anything it would be greatly appreciated... Wilo manifold Pump from Wunda + Isolators Digital room thermostat (recommendations?) Willis jacket + immersion Timing Switch to ensure E7 use Electricians will fit all wiring and controllers but I supply everything. Possibly a 2 port valve as per @Nickfromwales recommendation in this thread but not sure if this is necessary? Trying to keep it as simple as possible at this stage. Edited November 5, 2019 by bissoejosh Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now