Help anyone, just been advised by one of the tilers providing a quote that the UFH system needs to be powered and tested prior to laying floor tiles to reduce the risk of cracking.
The frame is MBC with MBC laid pipes but looking to get tiles / kitchen in asap but power not expected until early December so dependancies are creating a problem.
1) is cracking really a risk for this type of insulated floor?
2) is there a way to power test / heat cycle the UFH on temporary power?
3) Any other options / ideas?