Have a look at this please: The photo shows the joists supporting the (temporary) floor, and the Durisol wall which is at the head of the (currently temporary) stairs. The wall is 100mm short of the level of the top of the joists. I need to build the wall up to that level. There are three ways I can do so With Durisol alone With wood alone With a Dursiol base and timber 'bearer' built into the concrete. My concern is to make the level of the top of this bit of wall exactly the same as the level of the top of the joists. I ask because this is the head of the stairs, and so will be a high-traffic area. And, while I suspect that many of you will mutter ' There 'ee goes overthinking again ' , I'd rather have that than come on here wailing that (say) I wished I'd used a wooden bearer built into the concrete to support the chipboard floor..... The problem with Durisol alone would be that fixing the chipboard directly to concrete is not the best idea. The concrete would have to be perfectly flat and the perfectly level. Concrete shrinks doesn't it? So, it's an all wood bearer fixed into the Durisol as is, or a hefty wooden bearer concreted into some Durisol Wadja fink?