Hello all I'm at the stage where I'm looking for the best solution to strap/bolt down the soleplate of my TF to the blockwork and I am looking for your opinions/advice.
I'm currently looking for one of the following options fixed @ 800mm centres:
- Anchor bolts down through the soleplate.
- Chemical resin anchors down through the soleplate.
- Strap bend on the outside of the blockwork going up and over the soleplate.
- Flat strap on the outside of the blockwork that goes up the studs.
Any advice and help would be greatly appreciated.