Morning everyone
Our house build is progressing nicely and we have recently had the ufh installed both downstairs in the traditional way (stapled to insulation, screed on top) and also on the first floor, in 25mm in between batons etc.
We then screwed and glued 6mm ply to the batons to protect the screed and provide a sound surface for tiling/flooring.
Although the dry screed was swept and hoovered before the ply was laid The problem we are now finding is a 'crunching' noise when you walk around, between the ply and the screed.
Has anyone who has used this system experienced similar problems? Does it go in time? I don't want to get to a position of getting carpets etc down and still hearing the annoying crunch.
Any advice/experience gratefully received.
Many thanks