As part of our planning approval we must have 2 car charging points before completion.
Even though we have zero chance of affording an electric car by the time we have paid for the build.
Do these have to have independent wires with their own trip switch, can they both go on the same wire and do they have to be independent of the building rather than attached to the outside wall of the dwelling.