  1. What Sewage treatment plant did you install?
  2. Yes Russell Griffiths, that removed the worry of additional weight on the tank. Did you pour this in stages.
  3. Thanks for your replies, I would have been more comfortable if I wasn’t adding the chamber riser (supplied by the manufacturer) so approx 1.5 metre of backfill on top of the tank. The tank isn’t going anywhere as enough concrete has been poured to secure it in place, up to the same level as you Joe90, where there is a route for any groundwater/ rainwater to naturally flow away, just concerned about the additional weight required to bring the ground level up to chamber level. I have phoned the supplier who is putting me in contact with the rep, but can’t see him knowing much about installation, may be proved wrong. Did think about adding lintels across the tank to support the weight, but is this overkill, and are these designed to be in the wet ground for years, if they were to fail it would be game over for the tank.
  4. Hello, There are no dig repair options available, this all depends on the extent of the damage, there are liners that can be inverted into sewers from manhole chambers, which effectively gives you a new pipe inside the existing pipe, also cutters to remove obstructions from within the pipe, As long as you have access, you did mention a chamber. slightly off subject, I am working on a job where a homeowner has lived in a property for a number of years and just started having issues with the shared sewer running under the property. Water company survey the drain and identify a steel pile driven through it. This pile was installed when the previous owner had work done to support the bay window 20 years earlier, the new home owner is liable for the costs to remove this pile. Lesson learnt by me, survey sewers prior to purchasing a property. YouTube sewer lining. hope this helps.
  5. Hello, just wondering about others thoughts on my current predicament. I have installed a Marsh Ensign 6 sewage plant and poured concrete up to the outlet level, as per installation advice, but now slightly confused on my next steps. In the installation sheet supplied it states if the ground is free draining, pea shingle can be used to backfill around the tank, but I have some concerns, obviously above the outlet level the tank is not provided support from the water inside, I also plan to use the supplied manhole riser which could add up to 1m of additional weight on the sewage plant from backfill to reach the cover height. Am I worrying about nothing? I did contact the manufacturer for advice, but felt a little fobbed off with their response, ‘as they can’t comment on individual sites as the ground conditions all differ’ I have visions of adding the backfill and the tank imploding, any advice gratefully received. thanks, Ryan
  6. I need to support the first floor joists, so this is the reason for the stud walls, rightly or wrongly, I wanted to keep the timber off the stone walls, as the battens I removed from the walls when i first stsrted stripping the building weren't in great condtion, rotten and wet, i coulndnt deternine the cause for this, possibly from the leaking roof or moisture from the walls. There are examples of wood fibre wall make up with cavity, see examples below, these are timber clad, but principle is similar. I know this is a more expensive option, but I do think the woodfibre will manage any internal moisture, and reduce the risk of condensation better than a vcl and non breathable insulation route.
  7. What route did you take?
  8. What's the theory behind woodfibre rather than celotex etc, given that its isolated from the main building? Surely thats just more expensive? What constitutes "extreme" regarding the weather? Rain? Hello Roger, I like this about a forum, where people challenge others decisions/ideas, this is not a sarcastic comment, as this makes me revisit my decision process and potentially stops me making a costly mistake. My understanding is that a breathable wall makeup regulates internal temperstures, assists with the movement of internal moisture through the wall to the vented cavity, which should prevent mold growth. I have pasted a few snippets from the internet below, I am no weather expert but I have experienced the changeable weather while working on the property, including heavy rain, snow and sunshine all in one day. no doubt there are stats online for most locations the uk, but the rear of the property is exposed and you can see the driven rain hitting the walls. The chapel is located close to the Sennybridge weather station. Parts of the UK experienced the coldest night of the season on Tuesday, with temperatures of -9.4C (15F) recorded in the village of Sennybridge, Powys, The deepest snow recorded was 30 cm (12in) in Sennybridge, near Brecon, while High Wycombe saw 17 cm. The second named storm of the 2018/19 season brought heavy rain with more than 56.4 mm recorded in Sennybridge, more than half a month's worth of rain.
  9. Another few days of reading several threads and attached links to websites and documents, I have a better understanding of the options available when insulating a solid stone wall, and why I decided to follow the route I have. I am going down the vented cavity route with a timber stud wall insulated with wood fibre. The chapel has stood for 160 years with little/ no heating and the walls are in sound condition, this cavity will act as a similar environment to how it has stood since it was built. The newly constructed insulated stud walls will allow the internal moisture/ air to travel through into the vented cavity. There is a chance of driven rain reaching the internal side of the wall so this is another reason I haven’t fixed insulation directly to the wall, the weather is extreme where the chapel is located, I also require the stud walls to support the first floor joists and didn’t want to fix a wall plate. thanks for everyone’s input and direction to other threads. Ryan
  10. Thanks for the reply, I will have a read through the old threads to see if I have missed anything, any particular one you took most from? The photo was taken just after removing the render so the stone looked a lot lighter, and better in my eyes, but after a long winter it’s not looking so good, beauty is in the eye of the beholder and at the moment I like the look of lime washed stone, as it keeps the shape of the stone visible, rather than a render, are you not a fan?
  11. Ignore the gypsum internal board( will use different board finished with lime) the airtight membrane between 60mm wood fibre insulation and vented cavity, no VCL as such, not unless I seal all penetrations of the internal osb board. The VCL debate in a breathable wall is another minefield, I can find every opinion imaginable for having a VCL or not!
  12. Yes lime to be used for pointing. As for the cavity, there has been no heating in the building for 20+ years and an internal corrugated bitumen lining attached to the walls, which has been removed. I have created air vents through the wall so the air will circulate in the cavity. I can monitor what is happening inside the cavity with a camera that I can insert through a vent, and will have the option to block or restrict these vents if they are causing problems. Window returns I feel are a potential weak point if not sealed and insulated correctly.
  13. I will look at bitumen tape, just need to work out how to attach it when I lift the stud sections into place.
  14. Thanks, I will have a look at the site. I am planning to leave the front un-rendered as it is relatively protected, just repoint and lime wash, the weather comes in from the back and side, which will be rendered. I have made some decisions that I have regretted, which would be too costly to reverse, and if I was to take on another project I would do differently, but that isn’t going to happen! I am ok with the cavity, as I can see the logic of the wall acting as a form of cladding, can see the benefit of the fixed direct to wall insulation and cavity route. I have read lots of threads where builders have insulated stone buildings, but can’t think of many where people that live in these properties share how they have performed, so appreciate your building performance update. I know every day is a school day, just would be good to learn from someone’s else’s mistakes, rather than my own (is this something I should of said, or kept it to myself?) it’s not all doom and gloom and I am enjoying the process…….honestly.
  15. I used the Ubakus U value calculator, this has a condensation calculator, the dew point displayed on the wall build up drawing.
  16. Perhaps I missed a trick with thermoblok, i have decided to go with a wider timber studwork so have shuttered and poured concrete to widen the perimeter dwarf wall. i have been reading up on sole plate sealng/ fixing, looking at either rubber or tapes., whats your plans? Maybe my BCO lack of interest or guidance isnt a blessing. i thought with the number of stone barns/ structures converted there would be lessons learnt, best practice, do & donts everywhere on the web. I am still hearing the adviice, build a stud wall and fill with rigid insulation, i think things have moved on from this.
  17. Thanks for the reply’s, as you can probably tell from my original post I am not a tradesman/ expert in building techniques, but try to research, listening to all advice and hopefully make an informed decision. I didn’t think of bringing the membrane through the sections where they join and sealing them at the front, thats why I like a forum. A question I have is if you have an airtight membrane/ layer on the external side of the stud, why is it required on the inside, only asking for my benefit, not questioning your method. I have also gone the dwarf wall to finish screed level. I am dreading completing this work and finding the building cold during the winter🤔 At the moment I am looking at wall build from internal, finish board undecided, osb, 150mm wood fibre batt in-between studs, 60mm t&g wood fibre, breather membrane, vented cavity, 600mm lime/stone wall. My BCO seems very uninterested in the spec, not sure if this is a good or bad thing. As for the vented cavity, I see the plus and the negatives, but can block, restrict air flow if required, I can monitor how the cavity is performing with an extendable camera. It wouldn’t of been an easy task to create the air vents once the internal stud wall is constructed. constructive comments welcome……. thanks, Ryan
  18. Hello, I know the subject of wall construction/ design has been covered previously, but would appreciate some input from people on their wall construction/design and how it performs. I am in the early stages of converting a stone chapel in Mid Wales, the walls are 600mm river stone, I was planning to construct an internal timber frame with a vented cavity. i have run a couple of designs through a U value calculator and decided on creating an aIr tight envelope with t&g woodfibre insulation on the outer side of the frame, filling the stud with Woodfibre batts, but I dont think its going to be an easy build, maybe build stud frames, attach t&g insulation boards, then lift into place, tape/ seal corners. Any advice/ info on wall design would be much appreciated, as the more i research this subject, the more confused I am. thanks, Ryan
  19. Thanks for speedy reply, I am at the stage of building the first floor, so a blank canvas in some ways. The location of the soil pipes are below the bathroom next to the stairs and in the top left hand corner of the building. I am looking to construct a timber frame inside of the existing random stone walls which will create a cavity for services, where required. The water pressure is low, so I will need to look at storage solutions. The space is tight upstairs, but have more space available downstairs for water storage. thanks Ryan
  20. Hello all, I am in the process of renovating a Methodist Chapel, I had plans drawn up. but have started to look at a different layout. The windows restrict the position of certain rooms for escape reasons and there is an open area at the front of the first floor, this is shown as a hall on the attached plan. I have included an en-suite on all the bedrooms as I plan to use the property as an Airbnb. Any suggestions/ advice on layout would be gratefully received. thanks Ryan
×
×