Jump to content

miike

Members
  • Posts

    101
  • Joined

  • Last visited

Everything posted by miike

  1. Have you heard anything back from them? I'm at 2+ months since submission and haven't even been asked for copies of invoices yet.
  2. I re-read the email and noticed that it only gives two options for sending documents - online via their website portal, or by post. And if they haven't got the docs in a month they'll reject the claim. I'd replied to the email with the documents attached to it, but realised they could technically ignore it and reject the claim after a month as I hadn't provided the documents via their listed methods. Just gone to the portal and uploaded the additional docs that way to be safe.
  3. I don't see how that could be the case - the house insurance is a tick box you fill in online and select a date you want coverage from, it's also entirely optional. The bc cert + council tax occupation date are far more relevant. Plus, if you're suggesting that they want to check the insurance doc because you couldn't have coverage if still doing building work, then I feel that HMRC would be delighted about this - it means they can keep the VAT you pay on any ongoing works.
  4. That's what I thought. Here is the exact wording: 'We need some more information before we can look at your claim, concerning your occupation of the property. Please provide a copy of the house and contents insurance documentation for the property...'
  5. Never heard of anyone else being asked for it. Suspect that they have a backlog and they're asking for random things from people to fudge their internal performance metrics to make it look like they're dealing with the cases instead of further delays.
  6. Finally got an update to say they will only look at my claim after I send them a copy of the house insurance...
  7. Early June for me and haven't even got the claim ref yet. Guess they've slowed right down at the moment as other people have previously said on here that they've had their claim reviewed, asked for invoices, and paid out in a similar time frame.
  8. The consensus seems to very much be on the let sleeping dogs lie side. After the initial visit I placed a couple very visible ring cameras by the road side and that may also have discouraged further complaints as you can't take photos without being recorded doing so.
  9. Towards the start of my build, I had a site visit from planning enforcement because of a complaint on the roof being built too high. The officer was somewhat confused when they arrived and found that the house didn't actually have a roof yet. They revealed that they'd had complaints for 9 other things including not following the landscaping plans, when no landscaping was close to even starting. This led them to concluding that the complaints were obviously vexatious and I never heard from them again, other than to confirm the case had been shut. The house has been completed now, and I'm willing to bet they received a variety of other nonsense complaints during that time. I'm wondering if it's worth contacting them myself now to ask them to officially confirm they're satisfied the house has been built to plans, or if its better to let sleeping dogs lie? My concern on the former, is if it's inviting them to go through everything with a fine tooth comb, potentially leading them to find a wall is an inch out, then asking me to rebuild it or apply for a planning alteration, which I believe would invalidate the CIL relief. My concern with the latter, is that if they decided in the future to investigate a complaint of 'the wall is an inch too wide' they might try harder to find fault than if I had contacted them myself to take a general overview of the house.
  10. I think that's more ambiguous as the answer should technically be 0 if you have a kitchen but no utility room.
  11. I'm I used Claude to help with mine. Had ~600 invoices/receipts and so many companies seem to make it difficult to just know the proper company name and VAT number. I got Claude to research the proper names and associated VAT numbers and put them in the spreadsheet. Still waiting for a response from HMRC so will see how it goes. Not sure about your last point - the house needs a kitchen to habitable, so the number must be at least 1 on that alone. If they're asking about utility rooms in the same question, then it seems logical that the answer would be 2 if you have one as well. I took the question as them trying to gauge what the realistic spend for your build would be. Submitting a 200k reclaim on a 500sqft house with a small kitchen seems far more irregular than on a 10,000sqft house with main kitchen, chefs kitchen, annex kitchen etc.
  12. It might not be the Rockwool absorbing sound though. It could be that it's now blocking wind, or if he's lent it against the door, or could be stopping vibration. New suggestion @boxrick, try taping the grooves in the front of the door. I wonder if they're having a similar effect to when you blow on the rim of a glass and get a whistling sound.
  13. Do you have any updates or further clues on the cause? I'm really curious about whats going on here.
  14. How about taping a polythene dust sheet around the door, then blowing a fan from the other side? Does the door feel heavy or light? Can you remove the door handle, or something, to look inside the door?
  15. That's a weird one. I have an aluminium door and it definitely doesn't transmit sound like this. It sounds like air coming in/out of a small gap, which may explain why it goes away when the door is open. Try burning a few matches near the door and see if the smoke gets sucked/blown from anywhere. Do you have MVHR? That could cause negative pressure and a whistling sound from sucking in air through a gap.
  16. Been to similar before and I found exhibitions with a b2c focus aren't of much value - they're basically just a way for businesses to source customer leads who are willing to pay £££. B2B exhibitions tend to be more useful as you can source direct from manufacturers at better prices.
  17. Selling 1 plot is less work than selling 2 plots, is probably the main thought process of the previous owner.
  18. If you have pp for 2 houses, 2 acres, and a tight budget, why not sell part of the plot with pp for 1 house to help fund your build?
  19. I spent some time putting together the differences battery size makes when paired with different PV systems. It varies quite a lot on the PV kWp and also whether or not you have an ASHP. Figures used for PV/Battery costs are from here 1. This shows the gain from PV with no battery and no ASHP 2. PV, no battery, with ASHP 3. Battery sizes (5, 10 and 15 kW) paired with different PV kWp. No ASHP 4. Battery sizes (5, 10 and 15 kW) paired with different PV kWp. With ASHP 5. Ranked by cheapest cost (total cost of PV + Battery) per SAP point gained. No ASHP 6. Ranked by cheapest cost (total cost of PV + Battery) per SAP point gained. With ASHP
  20. Elmhurst Energy, there's a 14 day free trial here but the actual license fee isn't too bad. I think they took over Stroma, which was who I'd seen recommended here previously.
  21. SAP 10.2, it's the latest version used for all post 2022 builds.
  22. Yes, took ages copying all the details into the new one before making changes. That 100% isn't for efficiency, it's for percentage of heat i.e. how much of the heating for the house is done by that unit (for situations where you have multiple sources).
  23. This is all done on the latest SAP 10 standards. I've attached some screenshots showing the score change from making one alteration to the spec, leaving all else the same. I reset the spec to the original before changing a new data field. I start on 87 B with no ASHP or MVHR, 0.15 u for roof and 0.1 u for walls. Air Tightness - no change in score between 6.60 and 0.10 Roof u-value (251m2 gross area) - 1 point change between 0.35 u value and 0.05 Adding MVHR - 5 point reduction to 82 Adding 6kW PV + 12 kWh battery - increase of 8 points to 95 Changes to data but keeping the PV and battery in the spec: Main heating source changed from mains gas to ASHP - 12 point reduction to 83 Flat roof u-value - improving u-value from 0.15 to 0.1 has no effect. Worsening the u-value to 0.7 drops the score by 3 points to 92
  24. My design SAP used a lot of standard assumed data, such as double glazed windows, no MVHR, gas boiler, numerous openings for air extraction etc. It had a score of 87 B. The actual build used significantly more insulation, 3G windows, MVHR, ASHP. The costs of the upgrades would be in the tens of £ks. After submitting all this info, my energy performance was downgraded to a C with an 8 point drop to 79. I thought the assessor must be entering something wrong so I got access to a trial version of SAP assessment program and re-did the info myself. Nope, it somehow actually gave me an even lower score of 73. I removed the MVHR and added vents, changed the ASHP to a mains gas boiler and straight back to 87. I understand how these can drop a SAP score because it focuses on electricity costs and these are electric devices, but it was interesting to see that none of the other improvements moved the needle by a single point. Out of curiosity, I started playing with some of the data and gave it an air tightness score of just above 0 and boosted the u-values of all the materials - I managed to get 1 additional point. The only thing that made any real difference was adding PV and a battery, which took it from between 93 to 100, depending on the kWh inputted. The lesson seems to be, if you want an A rating, is to keep everything standard, no 'eco' heating or ventilation systems, minimum insulation for building regs, and then just add a bit of PV. Might be useful for anyone needing to qualify for an Ecology mortgage.
  25. I've got a lot of left over PIR insulation boards, enough to fill a 12 yard skip, and have being trying to think of a possible way they could be used instead of paying £500 to just bin them. They're an awkward mix of sizes, tapered, and cuts, so selling them would be tough. At the same time, I have a sloping garden path which needs c400mm of backfilling. The ground is sandstone. Would there be anything problematic about laying some of the boards down first, prior to filling with the remaining aggregates? It would halve the amount of aggregates I'd then need to use. I've heard of people using PIR boards under soil in planters, to insulate the plants during the winter, so I assume they have some garden utility.
×
×
  • Create New...