Jump to content

Mike_scotland

Members
  • Posts

    473
  • Joined

  • Last visited

Everything posted by Mike_scotland

  1. Hi group, I have a Grant ashp that heats my water for the 300l cylinder, what temperature should the cylinder be? I was hearing something about a 1nc a week purge to 60 degrees or something? Thanks, Mike
  2. do you have a brand mate?
  3. Does anyone know about dishwasher tablets and washing machine tablets/powder can be used or?
  4. Do you use any cleaners for work tops etc? Like flash etc lol
  5. Hi guys, Can anyone share there experience with a sewage treatment plant and how they clean there house ? I was hearing shouldnt use bleach for cleaning. Thanks, Mike
  6. i called them this morning and they said i dont need to be in the property yet but when i am fill out the additional paperwork if its going to be longer than the time frame giving let us know and we can extend, lovely girl on the phone just hope she knows the ins and outs lol
  7. Hi bud i have mcs and epc but were going through sign off now m8 but its asking how many days you stayed in the house i put 1 as it wouldn't let me do zero... So it's asking for bank and id stuff, what do i have to do m8? Upload bank details with new address or what? Did you have same issues?
  8. I have and its asking for more details, e.g bank statements with address as hest pump on it m8
  9. Hi, Does anyone know to claim do you have to be living in the house and house signed off? We are going through the sign off and obviously not moved in yet. Thanks in advance. M
  10. how do i find that?
  11. It was 4.46 Envelope area of building is m2 468 it says. to be fair though there is still services coming through the floor and you can feel a draft so thats being sealed up today! so it could of maybe been better if it was all completed however we are rushing for the RHI so needed the AT test.
  12. i think likely a 3 or less but hey ho i think 4 isnt too bad!
  13. we might have you guys already we are ourangushome
  14. Just noticed you are Angus too, where abouts are you building bud? you on instagram doing a build blog?
  15. is 4 ok then or pretty poor?
  16. Hi Ralph, I am unsure but i will ask my builder for you.
  17. haha yeah seems a bit unregulated for me m8
  18. no MVHR mate, is 4 pretty good without MVHR then? i thought you had to get MVHR if you were below 3
  19. So we have just had our air tightness test carried out and i believe it was about 4 which is not too much under the 5 we were giving to aim for at BW stage.... i know a pass is a pass but i was hoping for lower.... anyone else had a 4 to begin with and managed to get it down or am i just being awkward lol?
  20. and toilet is 400mm off floor so i think the plate must be just 350 above the toilet bowl
  21. 750mm from FFL to centre of the plate
  22. this is what im wondering mate.... i have the wife up at the house now taking pictures and measurments
  23. Duravit DuraSystem Basic 1148mm Toilet Fixing Frame - WD1020000080 (victorianplumbing.co.uk) It should be this one as this is what we specified on the doucment we gave to the builder
  24. is it not 1148 frame? then adjustable upto 240?
  25. this is the dimensions diagram.... so basically is it saying the flush plate centred should be 1012 off the FFL, depending on the extension legs. The top of the toilet bowl is 400mm off FFL which im led to believe is standard
×
×
  • Create New...