AmKal
Members-
Posts
31 -
Joined
-
Last visited
Recent Profile Visitors
The recent visitors block is disabled and is not being shown to other users.
AmKal's Achievements
Member (3/5)
2
Reputation
-
Regarding rectification work, is is namely the wiring? Can the screed go down tomorrow considering the mains water issue is on the verge of being resolved and the plumber has agreed to change the D1 D2 issue with the flow.
- 75 replies
-
Thank you for all the comments. Regarding electrics is certainly isn't finished, but I will relay the fact it needs clipping and will discuss safety zones.
- 75 replies
-
- 75 replies
-
- 75 replies
-
- 75 replies
-
Hi, I spoke to the plumber today and showed the comments. He agreed to add a stop valve (after the floor has been screeded at the island). The joints from under the screed have been removed, see pics. The cold water is not as close to the other UFH pipes, but still there! I advised re. the D1 D2 and said it needs to 'fall' at an angle, I think he understands and will not let it go. I've posted a pic below of the join without the tap. Now my concerns move to the electrics! OMG!
- 75 replies
-
Yep, it's been a minefield from start. I'm in the thick of it now, so just have to continue sadly... unless I get another builder, but then that'll create even more issues! What's your thoughts on this wiring...
- 75 replies
-
- 75 replies
-
- 75 replies
-
- 75 replies
-
- 75 replies
-
So, builder is calling back plumber to add an isolation point from where the main water supply comes out of the ground. Where the pipe then moves to the store room, I have said the grey coloured joint that would have been put in screed is not. The pipe should have a joint above the screed. My friends father has seen the boiler and has also mentioned the need for a gate valve. First on the UFH return and second on the pipe leading to the hot water cylinder after the T. DOES THIS SOUND RIGHT? 3. All pipes will be insulated that go in the small pitched roof void. 4. Dry lining boxes to be replaced. 5. Cold water mains will be separated further from the UFH pipes. Ive attached a couple of more pics too. Hi, there is a portal frame, I believe BC have been.
- 75 replies
-
I'm going to meet at 12pm. With a clear demand to ensure the plumbing work is checked and redone to higher standards. Taking in to account all the comments above.
- 75 replies
-
I said the same thing, but was told it's fine. I'll ensure the joint from the mains is ABOVE the screed
- 75 replies
-
Hi, there is a portal frame, I believe BC have been.
- 75 replies
-
- 1