Jump to content

dave1967

Members
  • Posts

    90
  • Joined

  • Last visited

Everything posted by dave1967

  1. Not sure what you are on about. I was just thinking solar install may be an issue. Nothing to do with vat or price.
  2. Hi Im no expert but that's a straight forward roof but my first thoughts were your solar panels. They will have penetrated the felt and there could be broken tiles or bits missing from tiles under there. When i took my old panels of it was a right bodge underneath
  3. Hi Ive had an over garage extension ans have two void were the extension roof meets the main house areas which are inaccessible to insulate. Will building control be interested in these dead areas which have two block walls internally and is there anything that could be used.
  4. No, if not a leak condensation my stop when lagged.
  5. Condensation or more likly water getting in from dry ridge like mine does.
  6. The 2nd roofer i had wont come back but took the cash. I think the saddle detail may be the issue as it has the adhesive strip over the top. I would have put it underneath. There is a good chance water is getting in here as what you can see is not stuck so rain may be running under the valley tray and coming out at the bottom side of the dormer. Any thoughts appreciated
  7. Any thoughts on this. My thinking is water will be straight onto the felt in wet and windy weather.
  8. Afternoon I had a new roof late last year. Got to say i am disappointed with the job done. Mainly poor attention to detail. I've been having issues with water on the felt and collecting behind the fascias. I had a look today and was thinking if the felt going over the valleys is the issue and if it need cutting back. See pics. Oh and he wont come back to sort it.
  9. Ok thanks for that. Will have a think about the next step.
  10. What happened was i was quoted to replace panels which the solar company selected. Offer then accepted by myself. Third party company then turned up to do the install. They told me the issues and fixes when they left. Original company now saying I need to add more panels but that isn't efficient and will breach and negatively affect my payments during average weather but i cant benefit in full sun as limited. Other option is single inverter and rewire or leave as is with 2 strings. I am going for them to install 2.5kw inverter, not sure about wiring.
  11. It is a genuine solar installer that did the work. I think its just an oversight re the inverters not powering up. So the panels will have to be rewired to go to one inverter then?
  12. It is a genuine solar installer that did the work. I think its just an oversight re the inverters not powering up. So the panels will have to be rewired to go to one inverter then?
  13. If i connect them all to 1 inverter will have 2 sets of 3 in parallel so still only 109volts and not enough for inverter to kick in.
  14. The issue is i have 3 panels on each inverter so the installer said they are not getting to required start up voltage. So i need more panel or a new single inverter. No idea if this is correct.
  15. The issue is i have 3 panels on each inverter so the installer said they are not getting to required start up voltage. So i need more panel or a new single inverter. No idea if this is correct.
  16. System was already installed. So pleasant unknown surprise when we bought at auction and it was on 2011 tariff.
  17. Hi Got 2 1200s. No idea why. Maybe because old array of 10 had a few panels lower down and partly shaded. I now have a row of 6 just below the ridge.
  18. Evening Got the new panels 6 x dmarc 410w Now have another problem as they may not have enough voltage to kick start my 2 sunnyboy inverters. Didn't kick in between 3 and 4 on a dull day. Is a new inverter the answer?
  19. I thought that 100 each was ok. Change of anyway 6 420 will fit the roof better so going with them.
  20. Good question. I dont know if i can or not.
  21. That was from ovo. But they advised to check with ofgem who said what they say is not legally binding however as long as all the plant is not decommissioned up to the grid it should be fine. So a swap for repairs or cosmetic should be ok. It also says this on their website.
  22. Yes they are but i have read as long as they are the same kw it is not an issue.
×
×
  • Create New...