Jump to content
  • entries
    21
  • comments
    156
  • views
    15246

About this blog

Pete and Mandy's Highlands Build

Entries in this blog

Insulation, UFH, conduit and Slab

Day 31 of the build. (this is taken from the day we started shuttering the foundations) The weather up North has been spectacular for about 3 weeks, so we (Mandy and I) pushed to prepare and pour the slab before the weather changed, as I'm sure we will get a few weeks of low pressure, wet changeable weather after this spell. Following on from the foundation ICF walls, I'd already loaded around 20ton of 40mm to dust in a pile the slab area. Sat on the sand blinded radon barrier. Jo
×
×
  • Create New...