Skip to content
View in the app

A better way to browse. Learn more.

BuildHub.org.uk

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.
  • Entries

    5
  • Comments

    45
  • Views

    2148

About this blog

A self-build in Cambridge. 

Entries in this blog

I am hoping to start work on site in May, about two-months later than my original plan. Things may well slip further and I am fine if they do.   Currently, the timber frame is being designed, by a specialist frame-designer based in Herefordshire that was recommended by (and contracted via) my chosen local timber-frame company. And the frame designer has just sent me the line-and-point loads (see below), so I have in turn just sent those on to my foundations designer in Ireland so that
I am about a month behind the schedule in my mind. My signing-up with a timber-frame company was delayed as my favoured company moved their factory over Christmas. In the end I seriously considered no less than seven frame companies, met with five, and visited the factories of four. I have now chosen the company and will be signing on the dotted line soon. It is a local Cambridgeshire firm and represented for me the best balance between cost, their approach, and the personalities involved.
As I mentioned in my last post, as one of my very first actions I feel that I need to talk to my arboriculturalist. I think that many subsequent decisions depend on his answers.   My small plot (20m x 20m) has a chesntnut tree on its border and its roots are to be preserved. Those roots spread under about half my plot. And it is the half between my access gate and where the dwelling will be so exactly in the wrong place. Everything will travel across the roots. And the root zone is alm
My first jobs after my planning approval are to: (i) choose a timber-frame supplier; and (ii) arrange a conversation with my arboriculturalist. This post is about the (i). The next post will be about (ii).   Timber-frame suppliers: I am in touch with the usual names known to this forum. Not sure if I should be naming names here. Six in total. Two companies supply panellised frames with a range of insulation levels, including open panel and double stud. Two compani
Good news! I today obtained planning permission  and so I am starting my build blog.    Thanks to everyone on BuildHub for your help and support so far. I have already learnt so much from this forum, all the way from questions when I was viewing the plot and every stage since.  And an especial thanks to all the Buidlhubers that I have had the pleasure to visit so far. You have all been warm and welcoming and your advice and inspiration has been invaluable. Thank you! Thank you!  

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.