Ed_MK Posted April 10, 2018 Author Share Posted April 10, 2018 (edited) Well, i guess i will be meeting soon with the BCO and have the "talk" ... the issue i have is that none of the networks over the road from where my entrance will be are "adopted".. ..and nobody seems interested in little me wanting to connect ...and besides ..the road is busy too. Connecting via parents land was solving 2 problems at once ..connecting us up and them too. Plan B i suppose is to go ahead and pay the RIDICULOUS amount for connecting to mains, which is sad in a way as it will cost as much as the whole baseworks combined ...but such is life its all in the air ...as we need to focus all our finances at the moment to get the house up ..and then we will work out the connections and options ..priority is getting it up and dry I suppose i need to work out the fall ...as it is a long run below in the image b=road height (where my entrance will be) a=slab height (which will be approx 50cm above road datum) c=main sewer in street which is a deep 'un at 2.7m it is a long run. and i certainly dont want to 1. get any blockages on my parents land 2. have to dig TOO deep in that run between the 2 houses Edited April 10, 2018 by Ed_MK Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now