Skip to content
View in the app

A better way to browse. Learn more.

BuildHub.org.uk

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Floor Uplift Help

Featured Replies

Hi all.

We are currently in the process of trying to remove 800x800 porcelain tiles from our open plan kitchen.

The tile are coming up no problem but it's leaving a lot of adhesive behind.

Our plan we to uplift the tiles, which are laid on 20mm EPS150 Wet UFH system, 20mm T&G and 12mm ply.

The adhesive is sticking to the ply, also the ply and OSB are stuck together with screws and possibly adhesive.

Ideally I want to get back to down the insulation and

UFH pipes and pump a screed sub floor back in removing the floating floor system.

What would people opinions be about best approaching this?! We've started in the ultiity and haven't been able to uplift a section of the sub floor yet.

IMG_4697.jpeg

IMG_4698.jpeg

IMG_4699.jpeg

IMG_4701.jpeg

It looks like a bitch of a job.  Have you considered just taking up the tiles and fitting LVT flooring?  It will feel far less cold underfoot and they do a great range.

 

With the lack of underfloor insulation - which should be 150mm thick minimum for UFH - you won't get a perfect solution.  You may be able to incorporate some radiators for the problem areas.

  • Author

Hi thank you for the reply, yes we had considered that I just don’t know how to get the adhesive off the ply. I’ve tried a chisel bit on a sds but it seem to gouge the ply. I was going to try and get the ply and osb up and pump screed over the ufh and keep the insulation down. This would be 32mm to back fill. My issue is getting the ply and osb up. Unless like you say I just get the tiles up, I just don’t know the best solution to remove the adhesive to lay LVT. It is a bigger of a job! 

1 hour ago, AshleyH said:

I’ve tried a chisel bit on a sds but it seem to gouge the ply.

You can get scraper bits for the SDS which would be much better for the job.

Floor scraper?  Never used one mind but they look ideal if they can get purchase into the adhesive.  Or go at it with a floor grinder and create a load of dust!

IMG_1247.png

Edited by crispy_wafer

  • Author

Great thanks, I have just seen a video of a grinder with a diamond grinding cup and vacuum curtains around the grinder looks quite impressive not sure how practical it would be but looks like it works I’m just concerned about gauging too much of the ply if it is going to stay down. I’ll have ago in this utility bit first. Like I said ideally I wanted it all up except the ufh and insulation and back filled with screed. But it’s proving rather difficult uplifting the ply and osb as they are screwed and glued together! 

You could just use some self level compound over the adhesive to create a smooth surface.  The LVT installers would do this in any case.

Create an account or sign in to comment

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.