Beelbeebub Posted 2 hours ago Posted 2 hours ago Has anyone gone through the process of upping their export limit? I have an 8kw inverter limited to 3.68kw. I suspect my G99 was done (by the installer) on the fast track, hence my 3.68kw limit. I want to reapply to get it upped as they have done some work on my local network (and to compensate for the lower export rates). I've been going round in circles as everything on the website (national grid) is either the g98/G99 fast track - which assumes you are notifying of a sub 3.68kw system or the G99 full route which assumes the system isn't yet up. There doesn't seem to be a button or form for "here is my existing permission for this system, can I up the limits please" Anyone got any pointers?
Dillsue Posted 2 hours ago Posted 2 hours ago No idea about how NG operate but I emailed the SPEN area engineer who got a junior engineer to reply and we had a verbal agreement in a couple of days to double our existing 3.68kw G98 limit. Submitting the G99 form was just to formalise things...and take some cash off me! 1
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now