Hi All, 

 

trying to figure out the best order to get these steels in shown on image in blue.

internal existing and new beam b's have block walls on top upto roof supports then the big supporting beam across the back of the house. This weighs around 650kg and will be sat on engineering brick pillars either side. the existing beams will connect to the supporting beam with cleat connections.

 

would you fit the large beam first and then the two internals? also steels will be going up in between joist so top of steel to top of joist height. 

 

 Screenshot2025-11-23at15_26_36.thumb.png.193e4bc8ce74b26e7190dfb8806e9f2d.png

IMG_0407.jpg

IMG_0320.JPG

Edited by Galgt4
images
Posted

Long beam needs to go in first, as the two others appear to then hang off it. You wouldn't want to be hindered by the other smaller beams when getting the big ones in position, so that's what I'd do.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...