Skip to content
View in the app

A better way to browse. Learn more.

BuildHub.org.uk

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Improving insulation to existing dormer conversion

Featured Replies

My house has a dormer conversion done ~40 years ago (I haven't dug out the original pp application to find the exact date). As a result it has very poor insulation. I'd like to improve the insulation, which I think should be as straightforward  as stripping the plasterboard and relining with PIR. 

My question is: if I do this, will that require building control approval? Will this change likely require me to bring other aspects of the conversion up to current building regs? (eg fire door, protected escape)

 

thanks!

 

M

No you won’t need BC to improve the insulation and your 30 minutes fire resistance will stay the same 

Leave a small air gap and use a foil backed board 15 mil 

I am not yet engaged with AI except as a method of speeding up meat production, but here's what it says:

 

"Generally, upgrading room-in-roof insulation does require Building Control approval if more than 25% of the roof area is being replaced or re-covered, as this triggers the need to meet current thermal insulation standards. If the work involves replacing or significantly upgrading a thermal element (like a roof), building regulations apply, and you'll need to ensure the insulation meets the required standards. "

 

..and that's the line I have followed. Bldg Regs defines 'renovation of a thermal element' as 'adding or replacing a layer' (of an 'insulation sandwich')

If you're renovating more than 50% of a thermal element (your roof) or 25% of the whole building envelope then yes, you do need building control, but as it's already a room then you won't be subject to other regs.

 

An advantage of getting building control involved is that because there's an official record any improvement should be reflected in an EPC if you sell. If that's not important then a lot of people would just get on and make the improvement for their own benefit.

Create an account or sign in to comment

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.