Hello.

 

I hope all is well.

 

We need to have the following done:

  • pipes brought up from under the floor board, for two bathroom sinks
  • pipes brought up from under the floor board, for a shower
  • pipes brought up from under the floor board, for towel radiator
  • connect concealed shower valves to pipes
  • connect valves for bathroom sinks
  • waste pipes for the sinks, toilet and shower connected to external soil stack
  • install and connect frame for wall hung toilet
  • connect soil stack

 

Any ideas on how much this should cost?

 

We will also need to dig and connect the new soil stack to the existing drainage.

  • 3 weeks later...
Posted
On 01/04/2025 at 17:08, nod said:

Grand for the plumber 

200 for the ground worker 

Thanks - is that including materials?

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...