February 9, 20251 yr The roof is currently going on but I see leaks, thankfully for the rain!! It's part built so I'll explain where they are at with it, and I would appreciate some advice on the rectification work needed Warm flat roof; Joists on, furring on, osb on (glued and screwed), vcl (alutrix 600), 150mm celotex (glued down and foamed together), osb top layer on and screwed down. They have laid dpm to protect the roof, but I gave seen two areas with leaks coming through because they have missed the joist Will be very hard to see from a picture but I've added one. It's a constant drip.
February 9, 20251 yr Not really the optimal time of year to do a GRP roof. You may be struggling with this.
Create an account or sign in to comment