junglejim Posted January 11 Posted January 11 (edited) The upstand around our slab is cut for RSJ to fit into at slab level. I’m wondering how best to finish the exterior around this as will be closer to ground level and below the cladding. Presumably it could somehow be sand cement rendered? Thanks Edited January 11 by junglejim
nod Posted January 11 Posted January 11 You can shot fire a piece of SS mesh to it Then render over it
junglejim Posted January 11 Author Posted January 11 (edited) 11 minutes ago, nod said: You can shot fire a piece of SS mesh to it Then render over it Thanks, that’s useful. The side facing outwards is the ‘I’ shape so not a face. I’m thinking of insulating, adding noggins and then osb with dpc over but wondering if I’m better off covering in render board and extending down to overlap the slab? Edited January 11 by junglejim
nod Posted January 11 Posted January 11 Cement board is perfect for render But you still need mesh or a fibre mesh on top of the board
junglejim Posted January 11 Author Posted January 11 3 hours ago, nod said: Cement board is perfect for render But you still need mesh or a fibre mesh on top of the board Slightly concerned this could be a way for moisture to ingress (around edges of the RSJ) any tips on sealing? Considering expanding foam + mortar to fill gaps.
nod Posted January 11 Posted January 11 4 minutes ago, junglejim said: Slightly concerned this could be a way for moisture to ingress (around edges of the RSJ) any tips on sealing? Considering expanding foam + mortar to fill gaps. I would use a PU glue
junglejim Posted January 12 Author Posted January 12 14 hours ago, nod said: Cement board is perfect for render But you still need mesh or a fibre mesh on top of the board Figured a drawing would be useful as still a bit unsure of the best way to finish this. Thanks for all the tips.
junglejim Posted January 12 Author Posted January 12 Here’s a photo of how it is currently. Will obviously need to dig out the ground as well.
junglejim Posted January 12 Author Posted January 12 I’m wondering if there’s any mileage in filling the base of the RSJ with mortar? But probably not ideal from a cold bridging perspective.
Eric Posted January 13 Posted January 13 What is on the drawings? I would of expected pir infill of the rsj before the osb.
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now