Barny Posted July 30 Share Posted July 30 Hi This feels like a stupid question. We have block and beam floor with sleeper walls standing up. Just putting the airtight membrane in before putting extra insulation on top. I am assuming I need to cover the sleeper walls in membrane and tape to the membrane on the floor? This detail is not on my drawings from architect. is this how others have done it? Like a really complicated Christmas present!! Link to comment Share on other sites More sharing options...
scottishjohn Posted July 30 Share Posted July 30 whats going on top of your block =beam floor ? UFH ? If so you will have plastic sheeting ,then insulation , then screed that sheeting will come up above finished floor level and can join to air tight membrane on stud walls I am guessing sleepr walls come to to where you start stud walls , so ne big black plastic sheet across beams and up the sleeper walls and under the stud walls ,then insulatrion UFH piping and screed your finished floor will be at top of sleeper walls Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now