Fox Posted April 24, 2024 Posted April 24, 2024 Hi. I'm looking to install small pv setup (under 1kw) on my wooden pergola. All parts will be second hand. It's just to cover my Base load. I'm comfortable with electric but new to solar. 1. I need to inform my DNO about my installation, what will they require from me? 2. I don't want any export payments, I have a fairly new smart meter, will it not count my production as usage and charge me? 3. G98, what needed to get it? 4. As it will be system with battery I believe I need hybrid inverter? Can these be programmed when to charge/discharge battery. 5. What's elso do I need( panels, hybrid inverter, batteries) Thanks in advance
JohnMo Posted April 24, 2024 Posted April 24, 2024 5 hours ago, Fox said: 1. I need to inform my DNO about my installation, what will they require from me? G98 is after the install 2. I don't want any export payments, I have a fairly new smart meter, will it not count my production as usage and charge me? No 3. G98, what needed to get it? Fill in the forms, certified by a suitably qualified electrician and a drawing of the install. Your inverter needs to be G98 certified 4. As it will be system with battery I believe I need hybrid inverter? Can these be programmed when to charge/discharge battery. Depends on model I would assume 5. What's elso do I need( panels, hybrid inverter, batteries) - isolations switch AC as a minimum (I also include DC on both my arrays), cable, mounting system, DC connectors
Fox Posted April 25, 2024 Author Posted April 25, 2024 20 hours ago, JohnMo said: Hi. Thanks. Regarding part 3 g98 - does it have to be done by certified electrician or just " competent person"
JohnMo Posted April 25, 2024 Posted April 25, 2024 8 minutes ago, Fox said: Regarding part 3 g98 - does it have to be done by certified electrician or just " competent person" I would say qualified - what does competent mean with respect electrics and signing things off?
Fox Posted May 1, 2024 Author Posted May 1, 2024 Just another question, is setup with battery allowed under g98?
JohnMo Posted May 1, 2024 Posted May 1, 2024 11 minutes ago, Fox said: Just another question, is setup with battery allowed under g98? Depends on inverter I think
Dillsue Posted May 1, 2024 Posted May 1, 2024 4 hours ago, Fox said: Just another question, is setup with battery allowed under g98? Yep, with the right setup. If your battery is DC connected and your inverter carries a G98 cert then good to go. 1
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now