Philxyz Posted March 20, 2024 Posted March 20, 2024 (edited) How do I build an internal step, up 120mm to a door, over a screed floor with UFH? Both the floor and step will be tiled. I imagine a form with a concrete mix. Or do I need a specialist compound (eg Bal Level Fast)? I am not at all concerned about a fast dry but do I need something because of UFH? Thanks Edited March 20, 2024 by Philxyz add link
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now