March 20, 20242 yr How do I build an internal step, up 120mm to a door, over a screed floor with UFH? Both the floor and step will be tiled. I imagine a form with a concrete mix. Or do I need a specialist compound (eg Bal Level Fast)? I am not at all concerned about a fast dry but do I need something because of UFH? Thanks Edited March 20, 20242 yr by Philxyz add link
Create an account or sign in to comment